CAD Design, stainless TIG fabrication, pipe fitting, CNC machining, and site installation.

Project Overview

Tauranga City Council partnered with us to fabricate and install a 600mm stainless steel (SS) pipe system, including designing and manufacturing 600mm damper valves for their wastewater operations—additionally, the project involved installing PVC drains and water lines.

Project Outcomes

The project successfully delivered a new biofilter system to improve odour control at the wastewater treatment plant. Our team installed two precision-engineered 600mm damper control valves, facilitating a smooth transition between the existing and upgraded systems. The project was brought to full completion and ready for final commissioning.

“Projects like these are a fantastic opportunity to collaborate across industries, applying our expertise in stainless steel fabrication, precision engineering, and site installation. The complexity of integrating new systems with existing infrastructure always presents a unique challenge, but I’m proud to say that the Mount Maunganui Engineering team achieved an excellent outcome on this one.”

mark richards

Mark Richards

Jobbing Supervisor

Featured Projects

tcc lifting frame side

Tauranga City Council

Installed a safe, efficient system to lower the conveyor assembly for quick ground-level repairs.

taharoa steel site

Taharoa Ironsands

Delivering vital structural components for a 250-ton mobile cleaner spiral plant.

hot tap underwater dual

Bay Underwater

Design and fabrication of a hydraulically driven drill, enabling precise hull drilling.