Oceana Gold

Client

Oceana Gold–supporting gold mining operations in the Waihi district.

Industry

Industrial mining.

Project

Standardised frames, flexible motor choices, and efficient maintenance solutions.

Service

Design, fabrication, welding, machining, and fitting.

Project Overview

Mount Maunganui Engineering is proud to have been involved in developing specialised dewatering pump stands that efficiently remove water from below the surface in gruelling mining conditions.

Our team designed eight versatile pump frames with integrated safety guards with piping supports to minimise pipe movement that could suit various motor sizes, ensuring adaptability and longevity.

Project Outcomes

The seamless pump changeout system lowered downtime while keeping operations running without interruptions. This was due to the hard-wearing, future-proof design developed to withstand harsh mining environments and provide a flexible answer to accommodating future upgrades while reducing the time spent maintaining the machinery.
“Working alongside Oceana Gold and the mining industry at large reinforced the importance of collaboration, adaptability, and accuracy in delivering industrial solutions like these.”
rick leach

Rick Leach

Director

Featured Projects

tcc lifting frame side

Tauranga City Council

Installed a safe, efficient system to lower the conveyor assembly for quick ground-level repairs.

taharoa steel site

Taharoa Ironsands

Delivering vital structural components for a 250-ton mobile cleaner spiral plant.

hot tap underwater dual

Bay Underwater

Design and fabrication of a hydraulically driven drill, enabling precise hull drilling.