
Tauranga City Council
Installed a safe, efficient system to lower the conveyor assembly for quick ground-level repairs.
Taharoa Ironsands—a West Coast-based sand mine that extracts and processes ironsand for export to Asian steel mills.
Mining.
Fabrication of structural components for a 250-ton mobile cleaner spirals plant.
Fabrication, welding, and industrial painting.
Mount Maunganui Engineering played a key role in constructing the 250-ton mobile cleaner spiral plant by fabricating various vital structural components. These included the MCC Room, Level 1 and 2 platform structural sections, stairs and handrails, the MCS observation hut platform, and the 250 SHS MCS columns.
The project required seamless collaboration to meet staggered delivery deadlines and ensure every component was manufactured to Taharoa Ironsands’ specifications.
Operations Manager
Installed a safe, efficient system to lower the conveyor assembly for quick ground-level repairs.
Design and fabrication of a hydraulically driven drill, enabling precise hull drilling.
Designed, fabricated, and installed walkways for seamless bulk storage maintenance.